Cast-in passive fire protection

The cast-in fire collar for pipe penetrations in concrete slabs

Designed into the slab before the pour. In a fire, patented springs snap the seal shut, stopping flame and smoke between floors.

  • 3 minute rapid close
  • Up to 4 hours fire resistance
  • LPCB Certified and Approved
Sure Snap cast-in fire collar range: H110S, H65S and H150S
Find the right collar

The Sure Snap cast-in fire collar range

Sure Snap H65S cast-in fire collar

H65S

Ø up to 63 mm

For small-bore pipes, such as appliance and branch wastes.

PVCPPHDPE

LPCB Certified

Sure Snap H110S cast-in fire collar

H110S

Ø up to 110 mm

For standard plastic pipes, such as soil pipes and waste stacks.

PVCPPHDPE

LPCB Certified

Sure Snap H150S cast-in fire collar

H150S

Ø up to 160 mm

For large-bore pipes, such as main stacks and risers.

PVCPPHDPE

LPCB Certified


Accessories


Sure Snap 110mm cast-in collar height extension

Extensions

Stackable 50 mm rings for slabs deeper than 250 mm.

Fits all collar sizes

View product →

Sure Snap 110mm Manifold Recess Former

Manifold Recess Former

Recesses an H110S collar to support a pipe manifold.

For use with H110S

View product →

Specified with confidence

Why specifiers and installers choose Sure Snap

Third-party certified

LPCB-approved (Cert 1833a) and BRE-tested, with extended application across pipe types and configurations.

EI 180 / E 240BS EN 1366-3BS EN 15882-3 (EXAP)
LPCB Loss Prevention Certification Board and UKAS Product Certification 0007 mark

Designed in, not retrofit

Cast into the slab before the pour, so the seal is integral to the structure, not a wrap added afterwards.

Built for the site

Locator plate, reinforced cap and snap-off nail points for fast, clean installation and obvious de-nailing.

Fast-closing seal

Patented spring activation compresses the intumescent for a rapid close, in around three minutes.

UK supply & support

Stocked and supported in the UK by Selkent, with free on-site toolbox talks.

Listed on NBS Source for specification, and a member of the ASFP.

NBS Source listed
Association for Specialist Fire Protection member
How it works

How a Sure Snap collar seals a penetration

Where a plastic pipe passes through a fire-rated floor, it becomes a weak point. In a fire the pipe melts and burns away, leaving an open hole for flame and smoke to spread between floors.

A Sure Snap collar closes that hole and restores the floor’s fire resistance. Because smoke, not flame, causes most high-rise fire deaths, sealing the opening fast is what counts. Sure Snap is built to stop both.

It does this through patented spring activation. As the fire softens the pipe, fusible links release loaded springs that drive the Intumesh™ intumescent inward, closing the penetration in around three minutes and holding it for up to four hours, depending on pipe and configuration. Here is how that happens, step by step.

Sure Snap collar cast into a concrete slab, before the pipe is fitted

01


Before the pour

Cast into the slab

Fixed to the formwork by its locator plate, which holds it in place and keeps out slurry.

Plastic pipe installed through a cast-in Sure Snap collar

02


In service

Pipe runs through the slab

The plastic pipe runs through the collar, which stays dormant through normal service, ready to act.

Cutaway of a Sure Snap collar showing the intumescent lining that seals the pipe in a fire

03


In fire

The seal snaps shut

Fusible links melt and release the springs, compressing the Intumesh™ intumescent around the collapsing pipe.

See it in action

See why Sure Snap is the premium choice

We put a Sure Snap collar in a side-by-side fire test against a competitor’s fire collar. Sure Snap’s patented spring activation and the Intumesh™ intumescent deliver a fast-closing seal, stopping flame and smoke from escaping through the pipe.

Case studies

Trusted on major UK developments

Case study

Woodberry Down, London

Berkeley Group

Sure Snap cast-in collars were used to firestop plastic-pipe penetrations through the floor slabs on one of London’s largest residential regeneration schemes, installed in the formwork as each floor was poured.

London

Hackney regeneration scheme

Cast-in

Installed during the pour

LPCB

Third-party approved